Broward County Gap Analysis KMZ (21)
| Canal Opportunity |
| Needed Connection |
| Possible Route |
Highway Trail Crossings (17)
Six Lane Trail Crossings (14)
Trails and KSI Intersections (12)
Bike Facilities Gaps (18)
HIN with No Bike Facilities (16)
No Trails Along Canals (15)
Speed > 35 and LTS >= 3 (20)
Speed =< 35 and LTS>=3 (13)
30ft ROW Canal (19)
Surtax BP Projects (11)
| 2020 - 2028 |
| 2029 - 2042 |
| <all other values> |
HIN (4)
TIP BP Projects (3)
Posted Speed (2)
| |
| <Null> |
| BOTH 2 AND 3 |
| BUFFERED |
| COLORED |
| DESIGNATED |
| SHARROW |
| UNDESIGNATED (OBSOLETE) |
| <all other values> |
BMPO - Bike Network (7)
| Buffered Bike Lane |
| Marked Bike lane |
| No Identified Infrastructure |
| Paved Shoulder |
| Shared Lane Marking |
| Undesignated Lane |
| Wide Curb Lane |
| <all other values> |
BMPO - CSLIP & CSMP (6)
BMPO - Superconnectors (5)
Broward Metro Planning Org (BMPO) - Bundles (8)
Ped - High LTS/Access Tesselation (9)
| 0.0 - 0.3 |
| 0.4 - 0.6 |
| 0.7 - 0.9 |
| 1.0 - 1.4 |
| 1.5 - 2.7 |
Bike - High LTS/Access Tesselation (10)
| 0.0 - 0.5 |
| 0.6 - 0.9 |
| 1.0 - 1.5 |
| 1.6 - 2.5 |
| 2.6 - 4.7 |
|